Topsoil Calculator for Lawns & Gardens

Estimate topsoil for lawns, gardens, and landscaping projects.

Measure the topsoil layer

New topsoil layer 2 inLayer thickness above existing grade.

Example result

Base volume
3.70 yd³
Order quantity
3.70 yd³
Cubic feet
100.00 ft³
Measured area
600.00 ft²

Area × layer depth in inches ÷ 324. The order quantity adds the allowance you enter.

Showing the prefilled example.

Mound of topsoil at the edge of a work site
Topsoil for a new layer Use the area that will actually receive new material. Russel Wills · CC BY-SA 2.0 · Resized for web

How to use Topsoil Calculator

  1. How to Measure Topsoil Area. Measure the actual surface area in feet. For irregular landscaping, divide the site into simple sections and add their areas.
  2. Choose a Layer Depth. Enter the depth you intend to add, not the total depth of existing soil. Compare alternative depths before ordering.
  3. Topsoil vs. Garden Soil. Topsoil is not always a finished planting mix. Select the material based on the project and supplier description.

What you can calculate

  • Rectangle-based topsoil estimates with optional extra allowance.
  • Cubic-yard and cubic-foot results from the same exact measurements.
  • A soil-layer illustration and practical material notes.

See the Virginia Cooperative Extension soil-volume worksheet.

Worked example

30 ft × 20 ft × 2 in = 3.70 yd³ (100 ft³); with 0% extra, order quantity is 3.70 yd³. This example shows geometric or user-specified inputs, not a universal material recommendation.

Frequently asked questions

How many cubic yards of topsoil do I need?

Multiply the area in square feet by the depth in inches, then divide by 324. For 600 square feet at 2 inches, the result is about 3.70 cubic yards.

How deep should I spread topsoil?

The appropriate depth depends on whether you are establishing a lawn, correcting a surface, or preparing a planting bed. Use your project specification rather than assuming one depth for every job.

Does topsoil settle after delivery?

Settling varies with material composition, handling, and moisture. The extra allowance is user-controlled and is not an automatic prediction of settling.

Do I need to subtract patios and paths?

Yes. Only include surfaces that will receive new topsoil. Calculate the remaining sections separately if needed.

Should I order exactly the calculated amount?

The cubic-yard result describes geometric volume. Add a purchase allowance only if your supplier or project conditions justify it; no one allowance fits every job.